Fremont

PWC was awarded $15M contract with Fremont for the construction of three lined and covered anaerobic lagoons with a precast building used to house two large boilers, blowers and electrical controls.

Fremont Project


This project scope includes the complete replacement of the following:

  • The project scope included include a 1500 SCFM gas conditioning system that will clean the methane to natural gas standards. This gas is then pumped into the national grid.