Sioux City Renewables Facility

PWC was awarded a $5.7M contract for the construction of the pre-engineered metal buildings that will be used to house a 1200 SCFM gas conditioning system.

Sioux City Renewables Facility


This project scope includes the complete replacement of the following:

  • The gas conditioning system will be used to clean the methane from the WWTP and bring it to natural gas standards. This gas is then pumped into the national grid. We are installing the owner furnished gas conditioning equipment on this project.